PV Solar Energy in the Navajo nation with 36MW Facility in Kayenta

Power Conversion is controlled by 10 GPTech WD3 Inverter Stations with 3,6MW capacity each, ready for the extreme desert conditions in the region.

Title block

WD3 in Kayenta

The Kayenta Solar Facility is located on the Navajo Nation Reservation. With near to 118,000 photovoltaic panels mounted on single axis trackers, required surface is about 210 acres. The Arizona utility SRP will purchase the generated energy.

 

 

IS3600

Webinar: 1500Vdc Inverters for extreme conditions

 Date: 2017 Feb 20th at 15:00 (London Time)

Subscribe to our newsletter

Be informed about our latest news and events.

Subscribe to newsletter
Unsubscribe from newsletter
Email address: